EXHIBIT 10.83 SUPPLY CONTRACT BETWEEN TYCO SUBMARINE SYSTEMS LTD. AND ALASKA UNITED FIBER SYSTEM PARTNERSHIP Contract Variation No. 1 This Contract Variation No. 1 ("CV1"), dated effective as of December 1, 1997, is between Tyco Submarine Systems Ltd. (formerly known as Submarine Systems International Ltd.), a Delaware corporation ("Contractor") and the Alaska United Fiber System Partnership, an Alaska general partnership ("AU" or "Purchaser") as assignee of GCI Communication Corp., an Alaska corporation ("GCICC," and Contractor and AU, collectively, the "Parties," or individually, a "Party"). WHEREAS, Article 6 (Contract Variations) of that certain Supply Contract between Contractor and GCICC dated effective as of July 11, 1997 ("Supply Contract"), provides for the Parties' ability to modify the Supply Contract; WHEREAS, dated effective as of October 3, 1997, GCICC assigned all its rights and delegated all its duties under the Supply Contract to AU; NOW, THEREFORE, for valuable consideration hereby acknowledged, the Parties agree as follows: 1. Definitions. Unless specifically defined or redefined below, capitalized terms used herein shall have the meanings ascribed thereto in the Supply Contract. 2. Recitals. The Recitals are hereby modified by replacing in its entirety the first recital with the following new recital: WHEREAS, Purchaser desires to establish a fiber optic submarine cable system, to be known as Alaska United Fiber System ("System") linking the State of Alaska, with landings in Juneau at Lena Point North and Whittier at Lookout Point, and the State of Washington, with a landing in Norma Beach at Puget Sound, and such System is hereby defined to also include the Valdez Extension, as defined below; and, the Recitals are further modified by adding the following new recital: WHEREAS, Purchaser desires by this CV1 to include into the Work the addition of an extension of the System from Whittier to Valdez, Alaska (the "Valdez Extension") and to make certain other modifications to the Supply Contract; [CERTAIN INFORMATION HAS BEEN REDACTED FROM THIS DOCUMENT WHICH THE COMPANY DESIRES TO KEEP UNDISCLOSED AND A COPY OF THE UNREDACTED DOCUMENT HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.] 1 3. Article 2, Documents Forming the Entire Contract, is hereby amended with the following documents: - A Technical Volume; Volume 2-Valdez Extension - A revised Plan of Work; Appendix 6.1 - A Provisioning Schedule; Appendix 1(A)-Valdez Extension - A Billing Schedule; Appendix 2(A)-Valdez Extension - An Appendix 7; Straight Line Diagram-Valdez Extension The balance of Article 2 remains unchanged hereby. 4. Article 4(A), Contract Price is hereby amended and restated in its entirety as follows: A. Contract Price. 1. Prices shall be as set forth in Appendix 1, Provisioning Schedule. The initial Contract Price in United States Dollars (US $) is $********** ("Initial Contract Price") for the System. 2. The CV1 initial Contract Price in United States Dollars (US $) is $********** for the Valdez Extension ("CV1 Initial Contract Price"). 5. Article 5, Terms of Payment, is hereby modified as follows: Article 5(A)2 is amended by replacing the first sentence with the following sentence: "On or before **********, payment by Purchaser shall be secured by **********." Article 5(A)3 is replaced in its entirety with the following: 5(A)(3). The Payment Security for the Supply Contract and this CV1 will be (i) in the initial amount of $**********; and (ii) AU shall make an ********** payment **********, amounting to $**********, in accordance with the new Billing Schedule; Appendix 2(A). The ********** payment shall be correspondingly reduced by such $**********, plus **********. For the purposes of the Valdez Extension, Article 5(B) is hereby amended to add new Subarticles as follows: [INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] 2 5. Terms of Payment for CV1. (a) Down Payment. ********** of the CV1 Initial Contract Price ("CV1 Down Payment"), as provided in the CV1 Billing Schedule, shall be due after the execution of this CV1, and on or before **********. (b) Progress Payments. ********** of the CV1 Contract Price will be invoiced in accordance with the Billing Schedule in Appendix 2 (A). (c) Final Payment (i) The remaining balance, ********** of the CV1 Contract Price, will be invoiced upon the issuance of the Certificate of Provisional Acceptance for the Valdez Extension, as set forth in Article 9. (ii) In the event a Certificate of Commercial Service is issued prior to the issuance of the Certificate of Provisional Acceptance, the Purchaser shall be invoiced ********** of the remaining balance upon issuance of the Certificate of Commercial Service, with the balance to be invoiced upon the issuance of the Certificate of Provisional Acceptance. Article 5(D)5 is hereby superseded and replaced in its entirety with the following provision: 5. An invoice shall be deemed to have been accepted for payment if the Purchaser does not present a written good faith objection within ********** of the receipt date of the invoice by Mail, as defined in Article 35. The balance of Article 5 remains unchanged hereby. 6. Article 9, Acceptance. Article 9(B)(1) is hereby amended by modifying (i) the first sentence and (ii) inserting a new sentence after the first line of the existing text, with the balance of the section remaining unchanged, as follows: [INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] 3 B. Provisional Acceptance 1. This System shall be ready for Provisional Acceptance by **********. The Valdez Extension shall be ready for Provisional Acceptance by ********** ("CV1 Completion Date"). Provisional Acceptance occurs when the results of the Acceptance Testing demonstrate that the Work is sufficient to realize the System performance requirements set forth in the Specifications or such other System performance levels as agreed upon as acceptable by the Purchaser and the Contractor (hereinafter collectively "Performance Requirements"), and the Contractor has fulfilled its commitments under the Contract. 7. Article 10, Warranty. Article 10A, Warranty is hereby amended by adding the following sentence at the end of Article 10(A): The Warranty for the Valdez Extension shall ********** for the entire system. A new Article 10(E) is hereby added as follows: E. Notwithstanding to the contrary in Article 10(A), SL101 Cable provided by Contractor for the Valdez Extension shall include **********. 8. Article 22, Liquidated Damages. Article 22 is hereby amended and restated in its entirety as follows: Article 22, Liquidated Damages A. For the System (other than the Valdez Extension) the Contractor shall pay to the Purchaser by way of pre-estimated and liquidated damages for the delay and not as a penalty, an assessed amount equal to ********** under the following limited circumstances: [INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] 4 1. If the System **********: (a) Article 6 (Contract Variations); (b) Article 17 (Force Majeure); or (c) Other arrangements as agreed between the Purchaser and the Contractor; or 2. If **********. B. For the Valdez Extension only, the Contractor shall pay to the Purchaser by way of pre-estimated and liquidated damages for the delay and not as a penalty, an assessed amount equal to **********. 9. Article 45, Performance Guarantee. Article 45(A) is amended in its entirety as follows: A. Contractor shall, by **********, provide a performance guarantee (in a format mutually and reasonably acceptable to the Parties) to Purchaser having a value of ********** (1) ********** (2) ********** (hereinafter referred to as the "Guarantee Amount"). Article 45(B) is amended by deleting reference to ********** and replacing it with "Guarantee Amount." 10. Entire Agreement; Ratification. The Supply Contract and this CV1 represent the final agreement between the Parties and may not be contradicted by evidence of prior, contemporaneous or subsequent oral agreement of the Parties. There are no unwritten oral agreements between the Parties. Except as modified or supplemented hereby, the Supply Contract and this CV1 and all other documents and agreements executed in connection therewith shall continue in full force and effect. 11. Counterparts. This CV1 may be executed in any number of counterparts, all of which taken together shall constitute one and the same instrument. In making proof hereof, it shall not be necessary to produce or account for any counterpart other than one [INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] 5 signed by the Party against which enforcement is sought. 12. Governing Law. This CV1 shall be construed in accordance with the laws of the State of Alaska. 13. Effectiveness. This Contract Variation shall become effective upon the endorsement of Purchaser and Contractor. 14. Modifications only as Stated. Except as expressly modified in this CV1, in all other respects, the Supply Contract shall remain unchanged by this CV1. This CV1 is executed by duly authorized representatives of the Parties as set forth below. Tyco Submarine Systems Ltd. Alaska United Fiber System Partnership by GCI Fiber Co., Inc., a General Partner By: /s/ C.L. Calandra By: /s/ Richard M. Dowling Title: Vice President & General Counsel Title: Sr V.P. Date: 12/3/97 Date: 97 December 1 6 Plan of Work Appendix 6.1 GCI Communication Corp. Tyco Submarine Systems, Ltd. ALASKA UNITED FIBER SYSTEM PLAN OF WORK
Start End *** *** ID Work Activity Days Date Date Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 1 ALASKA UNITED FIBER SYSTEM 2 Contract Signing ********** 3 AUFS Invoicing 4 AUFS Down Payment Invoice issued 5 AUFS Down Payment Invoice Due 6 Valdez Extension Milestone Invoice #1 Issued (latest date) 7 Valdez Extension Milestone Invoice #1 Payment Due 8 Milestone Invoice #1 Issued (latest date) 9 Milestone Invoice #1 Payment Due 10 Milestone Invoice #2 Issued (latest date) 11 Milestone Invoice #2 Payment Due 12 Milestone Invoice #3 Issued (latest date) 13 Milestone Invoice #3 Payment Due 14 Valdez Extension Milestone Invoice #2 Issued (latest date) 15 Valdez Extension Milestone Invoice #2 Payment Due 16 Valdez Extension Milestone Invoice #3 Issued (latest date) 17 Valdez Extension Milestone Invoice #3 Payment Due 18 Milestone Invoice #4 Issued (latest date) 19 Milestone Invoice #4 Payment Due 20 Valdez Extension Milestone Invoice #4 Issued (latest date) 21 Valdez Extension Milestone Invoice #4 Payment Due 22 Valdez Extension Milestone Invoice #5 Issued (latest date) 23 Valdez Extension Milestone Invoice #5 Payment Due 24 Milestone Invoice #5 Issued (latest date)
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Date: 10/31/97 Task Milestone Rolled Up Task Rolled Up Progress Project Mgr-L. Riegler Progress Summary Rolled Up Milestone TSS Proprietary Page 1 of 8 GCI Communication Corp. Tyco Submarine Systems, Ltd. ALASKA UNITED FIBER SYSTEM PLAN OF WORK
Start End *** *** ID Work Activity Days Date Date Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 25 Milestone Invoice #5 Payment Due ********** 26 Fiber/Cable Manufacture 27 Place Cable & Fiber Order 28 Fiber Manufacture/Delivery 29 Cable Manufacture - Hitachi 30 Unit Fiber Structure (UF8) 31 Power Conductor (PC) 32 Extension 33 Post Survey BLD (final engineering) 34 Partial Section Details 35 Ship Tank Plan 36 Section Assembly Guidelines 37 Span Assembly 38 SPA Production 39 Armoring 40 SPA/LW Tasking 41 Cable Manufacture - Simplex (Valdez Extension) 42 Repeater Manufacture 43 Place Repeater Order 44 Manufacture 45 PSBU Manufacture 46 Repeater Delivery 47 Repeater/Cable Integration 48 Assembled System Test
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Date: 10/31/97 Task Milestone Rolled Up Task Rolled Up Progress Project Mgr-L. Riegler Progress Summary Rolled Up Milestone TSS Proprietary Page 2 of 8 GCI Communication Corp. Tyco Submarine Systems, Ltd. ALASKA UNITED FIBER SYSTEM PLAN OF WORK
Start End *** *** ID Work Activity Days Date Date Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 49 Cable Ready-To-Load - Hitachi ********** 50 Cable Ready-To-Load - Simplex 51 PFE Manufacture/Ship 52 Seattle 53 Place PFE Order 54 Manufacture - Medium Voltage 55 Factory Acceptance Test (FAT) 56 Ship to HUT Manufacturing Site 57 Whittier 58 Place PFE Order 59 Manufacture - Medium Voltage 60 FAT 61 Ship to Whittier Station 62 Lena Point 63 Place PFE Order 64 Manufacture - Low Voltage 65 FAT 66 Ship to Lena Point Station 67 Transmission Equipment Manufacture/Ship 68 Whittier (Valdez Extension) 69 Place TTE Order 70 Manufacture 71 FAT 72 Ship to Whittier Station
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Date: 10/31/97 Task Milestone Rolled Up Task Rolled Up Progress Project Mgr-L. Riegler Progress Summary Rolled Up Milestone TSS Proprietary Page 3 of 8 GCI Communication Corp. Tyco Submarine Systems, Ltd. ALASKA UNITED FIBER SYSTEM PLAN OF WORK
Start End *** *** ID Work Activity Days Date Date Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 73 Valdez ********** 74 Place TTE Order 75 Manufacture 76 FAT 77 Ship to HUT Manufacturing Site 78 Seattle 79 Place TTE Order 80 Manufacture 81 FAT 82 Ship to HUT Manufacturing Site 83 Whittier 84 Place TTE Order 85 Manufacture 86 FAT 87 Ship to Whittier Station 88 Lena Point 89 Place TTE Order 90 Manufacture 91 FAT 92 Ship to Lena Point Station 93 Land Cable Manufacture/Ship 94 Place Land Cable Order 95 Manufacture 96 Ship Land Cables to Sites
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Date: 10/31/97 Task Milestone Rolled Up Task Rolled Up Progress Project Mgr-L. Riegler Progress Summary Rolled Up Milestone TSS Proprietary Page 4 of 8 GCI Communication Corp. Tyco Submarine Systems, Ltd. ALASKA UNITED FIBER SYSTEM PLAN OF WORK
Start End *** *** ID Work Activity Days Date Date Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 97 TSE Installation/Training ********** 98 Valdez Extension 99 Whittier 100 Equipment On-Site at Station 101 Install TSE in Station 102 SAT 103 Type B Training 104 Valdez 105 Equipment On-Site at HUT Manufacturer 106 Install TSE in Containerized HUT 107 Containerized HUT FAT 108 Ship HUT to Landing Site (GCI) 109 Install HUT on Site (GCI) 110 SAT 111 Remaining AUFS Stations 112 Seattle 113 Equipment On-Site at HUT Manufacturer 114 Install TSE in Containerized HUT 115 Containerized HUT Testing 116 Ship Containerized HUT to Landing Site (GCI) 117 Install Containerized HUT on Site (GCI) 118 SAT 119 Type B Training 120 Whittier (Trunk Leg)
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Date: 10/31/97 Task Milestone Rolled Up Task Rolled Up Progress Project Mgr-L. Riegler Progress Summary Rolled Up Milestone TSS Proprietary Page 5 of 8 GCI Communication Corp. Tyco Submarine Systems, Ltd. ALASKA UNITED FIBER SYSTEM PLAN OF WORK
Start End *** *** ID Work Activity Days Date Date Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 121 Equipment On-Site at Station ********** 122 Install TSE in Station 123 SAT 124 Lena Point 125 Equipment On-Site at Station 126 Install TSE in Station 127 SAT 128 Land Construction 129 Valdez 130 Land Cables/Equipment On-Site 131 Land Construction Activities 132 Whittier 133 Land Cables/Equipment On-Site 134 Land Construction Activities 135 Lena Point 136 Land Cables/Equipment On-Site 137 Land Construction Activities 138 Seattle 139 Land Cables/Equipment On-Site 140 Land Construction Activities 141 Training 142 Emergency Land Cable Joint Training 143 Whittier 144 Valdez Extension Cable Loading/Transit to Seattle
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Date: 10/31/97 Task Milestone Rolled Up Task Rolled Up Progress Project Mgr-L. Riegler Progress Summary Rolled Up Milestone TSS Proprietary Page 6 of 8 GCI Communication Corp. Tyco Submarine Systems, Ltd. ALASKA UNITED FIBER SYSTEM PLAN OF WORK
Start End *** *** ID Work Activity Days Date Date Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 145 Load Valdez Extension Cable into RR Cars ********** 146 RR Transit to Seattle 147 Valdez Cable On-Site @ Seattle 148 Cable Loading/Laying Activities 149 Load Valdez Extension Cable From RR Cars 150 Transit to Hitachi Cable Factory 151 Cable Loading 152 Transit to Whittier/Port Call 153 Land Valdez Shore End, Beach Splice, Test 154 Lay/Bury Valdez Extension, Buoy End 155 Transit to Whittier/Port Call 156 Land Whittier S/E, Beach Splice/Lay toward Buoyed End 157 Recover Buoy/Perform Valdez Extension Final Splice 158 Land Segment 2 Shore End, Splice/Test 159 Lay/Bury 282 km Armored 160 Surface Lay 729 km Unarmored 161 Transit to Juneau/Coordination Meeting 162 Land Segment 3 Shore End, Splice/Test 163 Lay/Bury 142 km Armored 164 Surface Lay 210 km Armored 165 Lay/Bury 17 km Armored 166 Surface Lay 67 km Unarmored/Deploy BU 1 167 Surface Lay 1,208 km Unarmored 168 Transit to Seattle/Coordination Meeting
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Date: 10/31/97 Task Milestone Rolled Up Task Rolled Up Progress Project Mgr-L. Riegler Progress Summary Rolled Up Milestone TSS Proprietary Page 7 of 8 GCI Communication Corp. Tyco Submarine Systems, Ltd. ALASKA UNITED FIBER SYSTEM PLAN OF WORK
Start End *** *** ID Work Activity Days Date Date Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 169 Land Segment 1 Shore End, Splice/Test ********** 170 Lay/Bury 340 km Armored 171 Contingency 172 Final Splice 173 Transit to Depot/Offload Spares 174 Transit to Seattle/Off Charter 175 Commissioning & Acceptance Tests 176 Valdez Extension 177 Commissioning Tests 178 Confidence Trial 179 AUFS (excluding Valdez Extension) 180 Commissioning Tests 181 Confidence Trial 182 Ready for Provisional Acceptance - Valdez Extension 183 Ready for Provisional Acceptance - AUFS
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Date: 10/31/97 Task Milestone Rolled Up Task Rolled Up Progress Project Mgr-L. Riegler Progress Summary Rolled Up Milestone TSS Proprietary Page 8 of 8 Provisioning Schedule Appendix 1(A) Alaska United Fiber System Extention - Whittier to Valdez
FOB CIF Taxes Total Wet Plant - (Non-Repeatered) *** *** *** *** Marine and Transit Services *** *** *** *** TSE - Whittier *** *** *** *** TSE - Valdez *** *** *** *** Land Cable - Whittier *** *** *** *** Land Cable - Valdez *** *** *** *** Other *** *** *** *** Grand Total *** *** *** ***
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Alaska United Fiber System Tyco Submarine Systems Ltd. PROPRIETARY 10/30/97 Alaska United Fiber System Extention - Whittier to Valdez
Submerged Plant - Whittier to Valdez Type Quantity Unit Price FOB CIF Taxes Total Installed Cable SA *** *** *** *** *** *** *** DA *** *** *** *** *** *** *** Spare Cable SA *** *** *** *** *** *** *** DA *** *** *** *** *** *** *** Transitions - SA/DA *** *** *** *** *** *** *** Total Cable to Cable Joints LW Cbl-to-Cbl Joint *** *** *** *** *** *** *** SPA Cbl-to-Cbl Joint *** *** *** *** *** *** *** Polysleaves *** *** *** *** *** *** *** End Seals 11TH A-838518 *** *** *** *** *** *** *** 11SY A-838724 Common Spare *** *** *** *** *** *** *** Total Submerged Plant - Whittier to Valdez *** *** *** ***
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Alaska United Fiber System Tyco Submarine Systems Ltd. PROPRIETARY 10/30/97 Alaska United Fiber System Extention - Whittier to Valdez
Type Quantity Unit Price FOB CIF Taxes Total Marine Services Operations *** *** *** *** *** *** Transit *** *** *** *** *** *** Loading *** *** *** *** *** *** Port Calls *** *** *** *** *** *** Mob/Demob *** *** *** *** *** *** Sea Plow VII Operations *** *** *** *** *** *** Transit *** *** *** *** *** *** Mob/Demob *** *** *** *** *** *** Other Support Tug *** *** *** *** *** *** PLIB Operations *** *** *** *** *** *** Shore End Operations *** *** *** *** *** *** Cable Loading *** *** *** *** *** *** Cable Engineering *** *** *** *** *** *** Splicing Operations *** *** *** *** *** *** Marine Coordination *** *** *** *** *** *** Cable Transport by Rail Road *** *** Total Marine Services *** *** ***
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Alaska United Fiber System Tyco Submarine Systems Ltd. PROPRIETARY 10/30/97 Alaska United Fiber System Extention - Whittier to Valdez
Terminal Station Equipment - Whittier Type Quantity Unit Price FOB CIF Taxes Total Terminal Transmission Equipment FT 2000, OC48, Add Drop Ring *** *** *** *** *** *** TOA +16 w/Spares (2 Service = 1 Spare) *** *** *** *** *** *** Engineering Order Wires w/Spares *** *** *** *** *** *** Craft Interface Terminals *** *** *** *** *** *** Digital Distribution Frame *** *** *** *** *** *** Cable Terminating Unit - CTU *** *** *** *** *** *** Network Sync. Equipment *** *** *** *** *** *** Installation *** Subtotal TSE - Whittier *** *** *** Terminal Station Equipment - Valdez *** *** *** *** *** *** *** Terminal Transmission Equipment FT 2000, OC48, Add Drop Ring w/Spares *** *** *** *** *** *** TOA +16 w/Spares (2 Service + 1 Spare) *** *** *** *** *** *** Engineering Order Wires w/Spares *** *** *** *** *** *** Craft Interface Terminals *** *** *** *** *** *** Digital Distribution Frame *** *** *** *** *** *** Cable Terminating Unit - CTU *** *** *** *** *** *** Network Sync. Equipment *** *** *** *** *** *** Installation *** Subtotal TSE - Valdez *** *** ***
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Alaska United Fiber System Tyco Submarine Systems Ltd. PROPRIETARY 10/30/97 Alaska United Fiber System Extention - Whittier to Valdez
Type Quantity Unit Price FOB CIF Taxes Total Land Cable - Whittier RL *** *** *** *** *** *** MV-90 *** *** *** *** *** *** Installation *** *** *** *** *** *** Ocean Ground Bed *** *** *** *** *** *** Subtotal Land Cable - Whittier *** *** *** Land Cable - Valdez RL *** *** *** *** *** *** MV-90 *** *** *** *** *** *** Installation *** *** *** *** *** *** Ocean Ground Bed *** *** *** *** *** *** Subtotal Land Cable - Valdez *** *** ***
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Alaska United Fiber System Tyco Submarine Systems Ltd. PROPRIETARY 10/30/97 Alaska United Fiber System Extention - Whittier to Valdez
Type Quantity Unit Price FOB CIF Taxes Total Other Acceptance Testing *** *** *** *** *** *** Engineering Services *** *** *** *** *** *** Warranty (Impact to AUFS) *** *** *** *** *** *** Project Management *** *** *** *** *** *** Documentation *** *** *** *** *** *** Original (Added Development) *** *** *** *** *** *** Copies Subtotal - Other *** *** ***
[INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Alaska United Fiber System Tyco Submarine Systems Ltd. PROPRIETARY 10/30/97 Billing Schedule Appendix 2(A) Billing Schedule for AUFS Extension - Option A
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total *** *** *** *** *** *** *** *** *** ***
Contract Signature *** *** Fiber/Cable Manufacture Complete *** *** Transmission Equipment Manufacture Complete *** *** Final Splice Complete *** *** Provisional Acceptance *** *** TOTAL *** *** AUFS Extension Tyco Submarine Systems Ltd. (TSSL) PROPRIETARY 12/1/97 Valdez Extension Straight Line Diagram Appendix 7 Option A Whittier Valdez *** *** *** *** *** *** *** *** *** *** tentative burial max depth = *** Notes: 1. This SLD is a pre-survey document for planning purposes only; no detailed engineering has been conducted. 2. All distances are in kilometers. 3. Land Cable is estimated, as are transitions in the segment lengths. 4. Burial may be required as indicated. 5. This diagram corresponds to issue "A" of the RPL. 6. The selection of "Option A" or "Option B" will be determined with the results of the survey. SUMMARY OF CABLE TYPES AND QUANTITIES ALASKA UNITED FIBER SYSTEM WHITTIER TO VALDEZ EXTENSION Option A STRAIGHT LINE DIAGRAM Land *** PRE-SURVEY CABLE ESTIMATES DA *** SA *** ISSUE NO FILE ENGINEER ISSUE DATE CLASS Total *** A1 VALDEZ CC 07 AUG 97 B TYCO SUBMARINE PAGE 01 SYSTEMS, INC. OF 01 PAGES [INFORMATION HAS BEEN REDACTED FROM THIS PAGE PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT SUBMITTED TO THE SEC.] Alaska United Fiber System Extension TYCO SUBMARINE SYSTEMS L.T.D. PROPRIETARY